{"id":8323,"date":"2026-08-18T08:17:02","date_gmt":"2026-08-18T01:17:02","guid":{"rendered":"https:\/\/dev.plnenergigas.co.id\/tanjung-batu-project"},"modified":"2026-09-03T11:47:44","modified_gmt":"2026-09-03T04:47:44","slug":"tanjung-batu-project","status":"publish","type":"page","link":"https:\/\/dev.plnenergigas.co.id\/en\/tanjung-batu-project","title":{"rendered":"Tanjung Batu Project"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row full_width=&#8221;stretch_row&#8221; gap=&#8221;30&#8243; content_placement=&#8221;top&#8221;][vc_column css_animation=&#8221;slideInUp&#8221; width=&#8221;3\/4&#8243;][vc_single_image source=&#8221;featured_image&#8221; img_size=&#8221;full&#8221; css=&#8221;&#8221;][vc_column_text css=&#8221;&#8221;]PT. PLN Energi Gas has successfully built 48.3 Km Tanjung Batu Gas Pipeline Gasification Project in Samarinda, East Kalimantan on December 31, 2020. And now PT PLN Energi Gas is operating the pipeline and its gas terminal to connect to power plants.<\/p>\n<p>The aim of this project is to replace HSD (that was once being used) and reduce the basic cost of electricity. The projection of saving for PLN could reach up to IDR 1.17\/year or 68.1 Million USD\/year.<\/p>\n<h3>Keterangan Instalasi<\/h3>\n<p><strong>INSTALLATION NAME<\/strong><br \/>INSTALASI PIPA PENYALUR GAS RUAS PK 52 SALIKI \u2013 TANJUNG BATU &amp; RUAS TANJUNG BATU \u2013 PLTGU &amp; PLTG PEAKING<\/p>\n<p><strong>OWNER<\/strong><br \/>: PT PLN GAS &amp; GEOTHERMAL<\/p>\n<p><strong>USER<\/strong><br \/>: PT PLN INDONESIA POWER<\/p>\n<p><strong>CAPACITY<\/strong><br \/>: 80 MMSCFD<\/p>\n<p><strong>PIPE SIZE &amp; LENGTH<\/strong><br \/>: 16&#8243; &amp; \u00b148,3 KM<\/p>\n<p><strong>POWER PLANT SUPPLIED<\/strong><br \/>: PLTG TANJUNG BATU 60 MW &amp; PLTG PEAKING[\/vc_column_text][\/vc_column][vc_column css_animation=&#8221;none&#8221; width=&#8221;1\/4&#8243;][vc_wp_custommenu title=&#8221;Operational Area&#8221; nav_menu=&#8221;66&#8243;][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row full_width=&#8221;stretch_row&#8221; gap=&#8221;30&#8243; content_placement=&#8221;top&#8221;][vc_column css_animation=&#8221;slideInUp&#8221; width=&#8221;3\/4&#8243;][vc_single_image source=&#8221;featured_image&#8221; img_size=&#8221;full&#8221; css=&#8221;&#8221;][vc_column_text css=&#8221;&#8221;]PT. PLN Energi Gas has successfully built 48.3 Km Tanjung Batu Gas Pipeline Gasification Project in Samarinda, East Kalimantan on December 31, 2020. And now PT PLN Energi Gas is operating the pipeline and its gas terminal to connect to power plants. The aim of this<\/p>\n","protected":false},"author":1,"featured_media":8324,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-8323","page","type-page","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/dev.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/pages\/8323","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dev.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/dev.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/dev.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dev.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/comments?post=8323"}],"version-history":[{"count":2,"href":"https:\/\/dev.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/pages\/8323\/revisions"}],"predecessor-version":[{"id":8326,"href":"https:\/\/dev.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/pages\/8323\/revisions\/8326"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dev.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/media\/8324"}],"wp:attachment":[{"href":"https:\/\/dev.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/media?parent=8323"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}