{"id":8549,"date":"2024-12-20T15:27:00","date_gmt":"2024-12-20T08:27:00","guid":{"rendered":"https:\/\/dev.plnenergigas.co.id\/pln-energi-gas-ready-to-ensure-energy-supply-during-the-2024-2025-christmas-and-new-year-holidays"},"modified":"2026-09-07T11:38:06","modified_gmt":"2026-09-07T04:38:06","slug":"pln-energi-gas-ready-to-ensure-energy-supply-during-the-2024-2025-christmas-and-new-year-holidays","status":"publish","type":"post","link":"https:\/\/dev.plnenergigas.co.id\/en\/pln-energi-gas-ready-to-ensure-energy-supply-during-the-2024-2025-christmas-and-new-year-holidays","title":{"rendered":"PLN Energi Gas Ready to Ensure Energy Supply During the 2024\u20132025 Christmas and New Year Holidays"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><b>Samarinda, 20 December 2024 <\/b><span style=\"font-weight: 400;\">\u2013 PT PLN Energi Gas demonstrated its commitment to ensuring a secure energy supply during the 2024\u20132025 Christmas and New Year (Nataru) period through the Nataru Readiness Initiative held at PK 52 Muara Badak and the Tanjung Batu Gas Station in East Kalimantan.<\/span><\/p>\n\n<p class=\"wp-block-paragraph\"><span style=\"font-weight: 400;\">The event was attended in person by the President Director of PT PLN Energi Gas, Mr. Edwin Bangun, along with management from PLN Energi Gas, both from headquarters and the Tanjung Batu Unit. The presence of these company leaders underscored the importance of operational readiness in maintaining the stability of the energy supply during this period of high energy consumption.<\/span><\/p>\n\n<p class=\"wp-block-paragraph\"><span style=\"font-weight: 400;\">During his visit, Mr. Edwin Bangun personally inspected the facilities at PK 52 Muara Badak and the Tanjung Batu Gas Station. He expressed his appreciation to the entire operational team for their hard work in ensuring the readiness of infrastructure and operations on-site. \u201cWe are committed to providing the best service to the public by ensuring that the energy supply remains reliable and safe throughout this Nataru Readiness period. Synergy between the central team and operational units in the field is the key to our shared success,\u201d said Edwin Bangun.<\/span><br\/><br\/><span style=\"font-weight: 400;\">This Nataru Readiness initiative involves various strategic measures, including:<\/span><br\/><ul>&#13;\n \t<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">A comprehensive inspection of gas infrastructure and distribution networks to ensure operational reliability.<\/span><\/li>&#13;\n \t<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Intensive coordination between the central team and field units to anticipate potential disruptions.<\/span><\/li>&#13;\n \t<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Deployment of personnel and support equipment on 24-hour standby during the Nataru period.<\/span><\/li>&#13;\n<\/ul><\/p>\n\n<p class=\"wp-block-paragraph\"><span style=\"font-weight: 400;\">The Tanjung Batu Gas Station and PK 52 Muara Badak are part of PT PLN Energi Gas\u2019s strategic infrastructure, playing a vital role in distributing energy to various regions in East Kalimantan. With both locations fully prepared, PT PLN Energi Gas is confident it can meet the community\u2019s energy needs during the Nataru period.<\/span><br\/><br\/><span style=\"font-weight: 400;\">In addition, PT PLN Energi Gas is also conducting training and simulations to enhance the technical capabilities and rapid response of its operational teams in handling emergency situations. This training is designed to strengthen coordination among various work units and ensure that all personnel have a thorough understanding of safety and operational procedures.<\/span><\/p>\n\n<p class=\"wp-block-paragraph\"><span style=\"font-weight: 400;\">Mr. Edwin Bangun also emphasized the importance of using the latest technology to support the company\u2019s operations. \u201cWe continue to innovate by leveraging technology to improve the efficiency and reliability of the energy distribution system. This is part of our efforts to make a tangible contribution to supporting the clean energy transition in Indonesia,\u201d he added.<\/span><\/p>\n\n<p class=\"wp-block-paragraph\">This initiative focuses not only on technical aspects but also on a human-centered approach. PT PLN Energi Gas pays special attention to the well-being of the operational team on duty during the Christmas and New Year period. Various support programs, such as providing adequate rest facilities and recognizing field staff, have been put in place to ensure high morale.<\/p>\n\n<p class=\"wp-block-paragraph\"><span style=\"font-weight: 400;\">In addition, PT PLN Energi Gas has also established partnerships with local governments and various stakeholders to ensure the smooth distribution of energy in the East Kalimantan region. This synergy is expected to have a significant positive impact, not only on the community but also on regional economic growth.<\/span><\/p>\n\n<p class=\"wp-block-paragraph\">Contact Person<\/p>\n\n<p class=\"wp-block-paragraph\">Corporate Secretary<\/p>\n\n<p class=\"wp-block-paragraph\">PT PLN Energi Gas<\/p>\n\n<p class=\"wp-block-paragraph\">021-29721019<\/p>\n\n<p class=\"wp-block-paragraph\">About PLN Energi Gas<\/p>\n\n<p class=\"wp-block-paragraph\">PT PLN Energi Gas (PLN EG) is a subsidiary of PLN EPI that operates in the midstream gas sector. The company\u2019s core competency is the distribution of gas (pipeline gas and LNG) onshore and offshore (FSRU and LNGC) to power plants with high reliability.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Samarinda, 20 December 2024 \u2013 PT PLN Energi Gas demonstrated its commitment to ensuring a secure energy supply during the 2024\u20132025 Christmas and New Year (Nataru) period through the Nataru Readiness Initiative held at PK 52 Muara Badak and the Tanjung Batu Gas Station in East Kalimantan. The event was attended in person by the<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[77],"tags":[],"class_list":["post-8549","post","type-post","status-publish","format-standard","hentry","category-press-release"],"acf":[],"_links":{"self":[{"href":"https:\/\/dev.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/posts\/8549","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dev.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dev.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dev.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/dev.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/comments?post=8549"}],"version-history":[{"count":1,"href":"https:\/\/dev.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/posts\/8549\/revisions"}],"predecessor-version":[{"id":8550,"href":"https:\/\/dev.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/posts\/8549\/revisions\/8550"}],"wp:attachment":[{"href":"https:\/\/dev.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/media?parent=8549"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dev.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/categories?post=8549"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dev.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/tags?post=8549"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}