PT. PLN Energi Gas has successfully built 48.3 Km Tanjung Batu Gas Pipeline Gasification Project in Samarinda, East Kalimantan on December 31, 2020. And now PT PLN Energi Gas is operating the pipeline and its gas terminal to connect to power plants.
The aim of this project is to replace HSD (that was once being used) and reduce the basic cost of electricity. The projection of saving for PLN could reach up to IDR 1.17/year or 68.1 Million USD/year.
Keterangan Instalasi
INSTALLATION NAME
INSTALASI PIPA PENYALUR GAS RUAS PK 52 SALIKI – TANJUNG BATU & RUAS TANJUNG BATU – PLTGU & PLTG PEAKING
OWNER
: PT PLN GAS & GEOTHERMAL
USER
: PT PLN INDONESIA POWER
CAPACITY
: 80 MMSCFD
PIPE SIZE & LENGTH
: 16″ & ±48,3 KM
POWER PLANT SUPPLIED
: PLTG TANJUNG BATU 60 MW & PLTG PEAKING